Bonneville Power Administration (BPA) proposes to raise the Ostrander-Pearl No. 1 transmission line including raising the height of structure 10/6 …
CX-021156: Roof Replacements and Thermal Performance Improvements at Garrison and Keeler Substations
Bonneville Power Administration (BPA) is proposing to conduct activities to improve thermal efficiency and moisture retention in buildings at two B…
Bonneville Power Administration (BPA) proposes to transfer ownership of several hatchery facilities to the Confederated Tribes of the Umatilla Indi…
Bonneville Power Administration (BPA) proposes to fund Pacific Northwest National Laboratory (PNNL) to research what conditions are necessary for s…
BPA proposes to continue funding the WDFW and NMFS to implement the M&E RSS project in the Wenatchee River.…
Bonneville Power Administration proposes to provide funds to the Confederated Tribes of the Warm Springs reservation of Oregon to replace a pump at…
Bonneville Power Administration proposes to allow applicant to construct a six foot wide gravel pedestrian pathway on the Bonneville right-of-way c…
Bonneville Power Administration (BPA) proposes to repair or improve approximately 18.25 miles and construct approximately 600 linear feet of access…
Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms…
Bonneville Power Administration (BPA) proposes to replace and relocate existing potential transformers (PTs). …