Replacement Ventilation System for the Main Plant Process Building CX(s) Applied: B6.3 Date: 07/11/2013 Location(s): New York Offices(s): West Valley Demonstration Project
Install Formed Core Sampler in Saltstone Disposal Facility Vault 2 CX(s) Applied: B6.3 Date: 12/09/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Hawaii Energy Sustainability Program (Subtask 2.4.1: Sub to Real Green Power (RGP))CX(s) Applied: A9, A11, B1.24, B3.6, B3.8, B3.11, B5.1, B6.3Date: 09/22/2010Location(s): Honolulu, HawaiiOffice(s): Energy Efficiency and Renewable Energy, National Ener...
Issaquah Highlands Zero Energy Affordable HousingCX(s) Applied: A9, B2.2, B2.5, B5.1, B6.3Date: 09/09/2010Location(s): Seattle, WashingtonOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Holy Cross Hospital Lighting RetrofitCX(s) Applied: A9, B2.2, B2.5, B5.1, B6.3Date: 07/23/2010Location(s): Chicago, IllinoisOffice(s): Fossil Energy, National Energy Technology Laboratory
Connecticut Clean Cities Future Fuels Project - FairfieldCX(s) Applied: B5.1, B6.3Date: 05/11/2010Location(s): Fairfield, ConnecticutOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Weirbox InstallationCX(s) Applied: B1.6, B1.13, B2.5, B3.1, B5.4, B6.3Date: 04/02/2010Location(s): Casper, WyomingOffice(s): RMOTC
Spokane Tribe of the Spokane Reservation Energy Efficiency RetrofitsCX(s) Applied: B2.5, B5.1, B6.3Date: 11/06/2009Location(s): WashingtonOffice(s): Energy Efficiency and Renewable Energy