CX-014572: Categorical Exclusion Determination

Spent Resin Removal and Addition of New Resin to Ion Exchange (IX) Columns Located at CPP-666 CX(s) Applied: B6.3Date: 01/07/2015 Location(s): IdahoOffices(s): Nuclear Energy

Office of NEPA Policy and Compliance

January 7, 2015
Estimated Read Time   min

Spent Resin Removal and Addition of New Resin to Ion Exchange (IX) Columns Located at CPP-666
CX(s) Applied: B6.3
Date: 01/07/2015
Location(s): Idaho
Offices(s): Nuclear Energy

The proposed action will transfer spent resins from hold tanks located inside CPP-666 to on-site vendor-owned and operated resin dewatering equipment (EnergySolutions), with off-site disposal of the dewatered resins at the Nevada National Security Site.

Document(s) Available for Download