Build and Test of a Novel, Commercial-Scale Wave Energy Direct0Drive Rotary Power Take-Off Under Realistic Open-Ocean Conditions CX(s) Applied: A9, B5.15 Date: 12/16/2013 Location(s): Oregon, Virginia, Colorado Offices(s): Golden Field Office
Independent Energy Community Renewable Power System CX(s) Applied: B5.15 Date: 12/02/2013 Location(s): Utah Offices(s): Golden Field Office
Transforming Photovoltaic Installations Toward Dispatchable, Schedulable Energy Solutions CX(s) Applied: B3.6, B5.15 Date: 10/17/2013 Location(s): Oregon Offices(s): Golden Field Office
The Mid-America Regional Microgrid Education and Training Consortium CX(s) Applied: A9, B5.15 Date: 09/19/2013 Location(s): Missouri Offices(s): Golden Field Office
High Temperature DC-Bus Capacitors Cost Reduction and Performance Improvements CX(s) Applied: B3.6, B5.15 Date: 09/13/2013 Location(s): Indiana Offices(s): National Energy Technology Laboratory
High Temperature DC-Bus Capacitors Cost Reduction and Performance Improvements CX(s) Applied: B3.6, B5.15 Date: 09/13/2013 Location(s): Arizona Offices(s): National Energy Technology Laboratory
High Performance DC-Bus Capacitors CX(s) Applied: B3.6, B5.15 Date: 09/13/2013 Location(s): New York, Indiana Offices(s): National Energy Technology Laboratory
Algal-Based Renewable Energy for Nevada CX(s) Applied: A9, B5.15 Date: 09/11/2013 Location(s): Nevada Offices(s): Golden Field Office
Fractional Multistage Hydrothermal Liquefaction of Biomass and Catalytic Conversion into Hydrocarbons CX(s) Applied: A9, B5.15 Date: 08/29/2013 Location(s): Wisconsin Offices(s): Golden Field Office
Advanced Biomass Feedstock Supply Chain for Lower Cost, Higher Quality Feedstock Delivery CX(s) Applied: A9, B5.15 Date: 08/26/2013 Location(s): Ohio, Iowa, Iowa, Kansas, Tennessee Offices(s): Golden Field Office