Advanced Lean Burn Micro-CHP Genset CX(s) Applied: B3.6Date: 10/14/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
1 Kilowatt Recuperated Brayton-Cycle Engine Using Positive-Displacement Components CX(s) Applied: B3.6Date: 10/14/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Multiple Degradation Mechanisms in Reinforced Concrete Structures, Modeling and Risk Analysis - The University of Houston CX(s) Applied: B3.6Date: 10/14/2015 Location(s): IdahoOffices(s): Nuclear Energy
NREL – Power to Gas Pilot Skid Project; NREL Tracking No. 15-017 Award Number: DE-AC36-08GO28308 CX(s) Applied: B3.6, DOE/EA-1968 National Renewable Energy Laboratory (NREL) Date: 10/13/2015 Location(s): CO Office(s): Golden Field Office
DWPF Process Simulation CX(s) Applied: B3.6Date: 10/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
High-Efficiency Thermoelectric CHP CX(s) Applied: B3.6Date: 10/08/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
High Efficiency Split-Cycle Engine for Residential Generators CX(s) Applied: B3.6Date: 10/07/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Hanford High Level Waste Melter Riser Crystal Settling Test CX(s) Applied: B3.6Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Density Determination by Gas Displacement Picnometry CX(s) Applied: B3.6Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Efficient Capacitive Wireless Power Transfer System for Electric Vehicles CX(s) Applied: B3.6Date: 09/25/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy