Bonneville Power Administration (BPA) proposes to rebuild its approximately 20-mile-long, 115-kilovolt (kV) Benton-Scooteney No. 1 transmission lin…
The Bonneville Power Administration (BPA) proposes to repair fiber cable on the Grizzly – Captain Jack No. 1 transmission line between structures 1…
The Remote Sensing Laboratory–Andrews (RSL-A) would conduct flight operations using assets launched or deployed from facilities that support those …
Bonneville Power Administration (BPA) proposes to conduct an aerial patrol using a helicopter equipped with laser imaging, detection, and ranging (…
Idaho National Laboratory (INL) has been identified by Liteye as the ideal location to provide counter Unmanned Aircraft Systems (cUAS) systems tes…
Bonneville Power Administration (BPA) proposes to replace marker balls between 18/1 and 18/2 on the Keller Tap to Grand Coulee-Okanogan No.2 in Fer…
Bonneville Power Administration (BPA) proposes to replace marker balls on 17 transmission lines in Benton, Chelan, Columbia, Douglas, Franklin, Gar…
LM would conduct routine activities at the Grand Junction Regional Airport (GJRA) Calibration Pads Site (Site), located in Mesa County, Colorado.…
The U.S. Department of Energy (DOE) is proposing to provide funding to Colorado State University (CSU) for the design, development, and testing of …
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…