Bonneville Power Administration (BPA) proposes to prune (“side-limb”) trees along approximately 23 miles of the 230-kilovolt Addy-Cusick No. 1 tran…
The Bonneville Power Administration (BPA) proposes to decommission and remove the Hungry Horse radio station and Teakettle Repeater and install two fiber optic cables on the Hungry Horse-Columbia Falls No. 1 transmission line to take their place.
The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) is proposing to use uncrewed aircraft systems (UAS) to take aerial measurements of wake turbulence.
LM is proposing to issue access agreements for patented lands, some of which are private deeded property, adjacent to the ULP lease tracts in south…
Bonneville Power Administration (BPA) proposes to remove and replace certain fittings used to splice lengths of transmission line conductor togethe…
Bonneville Power Administration (BPA) proposes to repair damaged overhead ground wire in line mile 54 of the Ashe-Slatt No. 1 and Ashe-Marion No. 2…
HMIS Annual Categorical Exclusion (CX) B3.2, Aviation Activities for CY 2022…
LM is proposing to conduct aerial remote sensing surveys at the disposal site to facilitate long-term management of the disposal cell.…
Big Eddy - Redmond No. 1 Access Road Maintenance and Urgent Ross – Malin Fiber Line Repair…
Benton-Scooteney No. 1 Transmission Line Rebuild…