Categorical Exclusion Determinations: B3.1

Savannah River Site (SRS) has identified two viable locations, Sites C and G, that could support a utility-scale solar power plant to achieve the goal of 100 percent Carbon Pollution Free Electricity by 2030. A meteorological weather station will be installed at Solar Site C to gather data.