LM is proposing to conduct routine activities at the Central Nevada Test Area (CNTA), Nevada Offsite (NVOS) located in central Nevada 70 miles nort…
This revision to the Environmental Compliance Permit (ECP) for the Utah Associated Municipal Power System (UAMPS) Carbon Free Power Project (CFPP) …
LM is proposing to conduct routine activities at the Rio Blanco, Colorado, Site, an NVOS location.…
The project will model, design, and implement different stimulation strategies and utilize fiber optics to monitor the effectiveness of these strat…
Meet objective stated in Section I. C. of DE-FOA-0002364. Assess and study a pathway for Alaska's Rare EarthElements and Critical Minerals. Additio…
WVU and its partners will establish short and long-term methane monitoring stations at select operator field locations in order to quantify methane…
LM is proposing to conduct routine activities at the Rulison, Colorado, Site, which is an NVOS site.…
Collection of both coal refuse feedstock and fluidized bed combustion (FBC) ash at these FBC/Waste Coal Power Plant Facilities. We will collect 30 …
In November 2023, the U.S. Department of Energy (DOE) issued a Broad Agency Announcement indicating an interest in entering into one or multiple ag…
Assess the reactivity of mafic and ultramafic formations and crushed mine and industrial wastes with CO2, and their post-mineralization physical pr…