Construction and Operation of a Cask Processing Enclosure (CPE) at the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Lenoir City, TennesseeCX(s) Applied: B1.13, B3.1, B6.6Date: 04/19/2011Location(s): Lenoir City, Tennes...
Construction and Operation of a Cask Processing Enclosure at the Transuranic Waste Processing Center on the Oak Ridge Reservation, Lenoir City, TennesseeCX(s) Applied: B1.13, B3.1, B6.6Date: 04/19/2011Location(s): Lenoir City, TennesseeOffice(s): Envir...
Routine Monitoring, Maintenance, Research, General Site, and Administrative Actions at the Shiprock, New Mexico, Disposal SiteCX(s) Applied: A1, A8, B1.3, B1.11, B1.20, B3.1Date: 04/14/2011Location(s): Shiprock, New MexicoOffice(s): Legacy Management
C-Area CharacterizationCX(s) Applied: B3.1Date: 04/13/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Recovery Act: Rural Electric Cooperative Geothermal Development Electric and AgricultureCX(s) Applied: A9, B3.1, B3.7, B5.1Date: 04/12/2011Location(s): Paisley, OregonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Joint Inversion of Electrical and Seismic Data for Fracture Characterization and Imaging of Fluid Flow in Geothermal SystemsCX(s) Applied: A9, B3.1Date: 04/12/2011Location(s): ColoradoOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind EnergyCX(s) Applied: A9, B3.1, B3.6Date: 04/11/2011Location(s): Bowling Green, OhioOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Michigan-Tribal Energy Program-Keweenaw Bay Indian CommunityCX(s) Applied: A9, A11, B3.1Date: 04/04/2011Location(s): MichiganOffice(s): Energy Efficiency and Renewable Energy
Use of Real-Time Off-Site Observations as a Methodology for Increasing Forecast Skill in Prediction of Large Wind Power Ramps One or More Hours Ahead of their Impact on a Wind PlantCX(s) Applied: B3.1Date: 03/29/2011Location(s): Glacier County, Montana...
Improved Structure and Fabrication of Large High-Power Kinetic Hydropower System Rotors -Year 2CX(s) Applied: A9, B3.1, B5.1Date: 03/17/2011Location(s): New YorkOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office