Obtain Subsurface Soil Samples from Five Locations on the San Juan River Floodplain near Shiprock, New Mexico, Disposal Site. CX(s) Applied: B3.1Date: 03/26/2015 Location(s): New MexicoOffices(s): Legacy Management
Install Three Groundwater Monitoring Wells at 288-F Class ll Landfill CX(s) Applied: B3.1Date: 03/24/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Well Abandonment, (RGW 7C and RGW 7D) CX(s) Applied: B3.1Date: 03/05/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Vadose Zone Lysimeters Near Slit Trench 14 and MWMF CX(s) Applied: B3.1Date: 03/05/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Technology Integration Program CX(s) Applied: B3.1, B3.6Date: 03/04/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Technology Integration Program CX(s) Applied: B3.1, B3.6Date: 03/04/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
M-Area Vadose Zone Well Abandonment CX(s) Applied: B3.1Date: 02/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Well Abandonment CX(s) Applied: B3.1Date: 02/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Sentinel Wells MSB-113-A, -B, and -C for the A-2 Air Stripper System CX(s) Applied: B3.1Date: 01/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
McQueens Branch Hazard Mitigation CX(s) Applied: B3.1Date: 01/08/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office