Excess several pieces of equipment/machinery that have been taken out of service in N-Area.…
Disconnect and remove Rigid saw from weld test area in 711-2N.…
Disconnect and remove Do-All saw from Bldg. 711-N.…
Idaho National Laboratory (INL) uses shielded containers, including the Hot Fuel Examination Facility (HFEF)-5 cask and HFEF-14 cask, to transport …
BPA proposes to install conductor between BPA’s Biglow Canyon-John Day No. 1 transmission line and PGE’s Biglow Canyon substation, acquire equipmen…
Remove and excess 2 welding machines and 1 plasma cutter from building 717-F.…
Excess 36" bandsaw and replace with 24" bandsaw in Building 717-8N.…
AMP Robotics (AMP) and Idaho National Laboratory (INL) propose to develop a multimodal sensor that can identify, in real time, the organic and plas…
Disconnect and remove (3) welding machines currently located in building 711-N.…
The proposed project is to grant a permit to the U.S. Department of Agriculture (USDA), Agricultural Research Service (ARS), Sheep Experiment Stati…