INL uses LDRD investments to accelerate advanced nuclear energy Research, Development, and Demonstration (RD
Remove abrasive blasting media and filter from bead blaster currently in building 711-N and excess equipment.…
The U.S. Department of Energy (DOE) proposes to lease off-site warehouse space to provide storage and staging area to support construction of the A…
Excess several pieces of equipment/machinery that have been taken out of service in N-Area.…
Disconnect and remove Rigid saw from weld test area in 711-2N.…
Disconnect and remove Do-All saw from Bldg. 711-N.…
Idaho National Laboratory (INL) uses shielded containers, including the Hot Fuel Examination Facility (HFEF)-5 cask and HFEF-14 cask, to transport …
BPA proposes to install conductor between BPA’s Biglow Canyon-John Day No. 1 transmission line and PGE’s Biglow Canyon substation, acquire equipmen…
Remove and excess 2 welding machines and 1 plasma cutter from building 717-F.…
Excess 36" bandsaw and replace with 24" bandsaw in Building 717-8N.…