Bonneville Power Administration (BPA) proposes to install a new communications tower at the summit of Grouse Peak in Custer County, Idaho. BPA is c…
The Knolls Laboratory (Site) Security Upgrade Major Construction Project (Project) encompasses the installation of various upgrades to Site security buildings and infrastructure that is over 65 years old. The upgrades will improve Site physical security and operational efficiency. Existing security infrastructure and buildings will be remediated and demolished as part of the Project.
NOAA has been working with the INL to find a suitable location for a new tower and the new desired location is just south of the Lincoln Gravel Pit…
The U.S. Department of Energy (DOE), Richland Operations Office (RL), Security and Emergency Services Division (SESD), proposes to construct a secu…
Bonneville Power Administration (BPA) proposes to replace the batteries and related hardware and equipment located within an existing equipment bui…
Bonneville Power Administration (BPA) proposes to replace the two 6 GHz microwave radios at the communications facility at Malin Substation. The pr…
Bonneville Power Administration (BPA) proposes to allow T-Mobile to upgrade its telecommunications equipment and to reinforce transmission structur…
Bonneville Power Administration (BPA) proposes to remove and replace the current chain-link security fence and permanently remove the existing SPOK…
Bonneville Power Administration (BPA) proposes to remove the tops from approximately 16 trees that are currently either blocking, or at risk of blo…
The U.S. Department of Energy (DOE) proposed action is to provide a loan guarantee to LongPath Technologies, Inc. (hereinafter “LongPath”) as borro…