Hanford Mission Integration Solutions (HMIS) and their subcontractors perform siting, construction, modification, operation, and removal of microwa…
Bonneville Power Administration (BPA) proposes to allow Verizon to upgrade their antennas and equipment at an existing site called Rocky Flats. The…
Purpose: To ensure the safety and reliability of the bulk electric system.…
Bonneville Power Administration (BPA) proposes to allow Dish Enterprise to install new wireless network antennas and equipment on structure 10/4 on…
Bonneville Power Administration (BPA) proposes to install a new communications tower at the summit of Grouse Peak in Custer County, Idaho. BPA is c…
The Knolls Laboratory (Site) Security Upgrade Major Construction Project (Project) encompasses the installation of various upgrades to Site security buildings and infrastructure that is over 65 years old. The upgrades will improve Site physical security and operational efficiency. Existing security infrastructure and buildings will be remediated and demolished as part of the Project.
The U.S. Department of Energy (DOE), Richland Operations Office (RL), Security and Emergency Services Division (SESD), proposes to construct a secu…
Bonneville Power Administration (BPA) proposes to replace the batteries and related hardware and equipment located within an existing equipment bui…
Bonneville Power Administration (BPA) proposes to replace the two 6 GHz microwave radios at the communications facility at Malin Substation. The pr…
Bonneville Power Administration (BPA) proposes to allow T-Mobile to upgrade its telecommunications equipment and to reinforce transmission structur…