DeSoto Photovoltaic Variability Study CX(s) Applied: B3.1, A9, B1.11 Date: 12/01/2011 Location(s): Florida Offices(s): Golden Field Office
Longview Sectionalizing Breaker Upgrades CX(s) Applied: B1.11, B4.6 Date: 11/28/2011 Location(s): Washington Offices(s): Bonneville Power Administration
Safety and Security Component Installation and Alteration CX(s) Applied: B1.11, B2.2 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Install Fencing South of the Receiving Basin for Off-site Fuels (RBOF) to the East Side of 707-HCX(s) Applied: B1.11Date: 09/12/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Sandia Site Office
Olympic Pipeline Company Fence Upgrade at South Tacoma SubstationCX(s) Applied: B1.11Date: 09/07/2011Location(s): Pierce County, WashingtonOffice(s): Bonneville Power Administration
Routine Monitoring and Maintenance, Naturita, Colorado, Disposal/Processing SiteCX(s) Applied: B1.3, B1.11, B3.1, B3.8Date: 08/30/2011Location(s): Naturita, ColoradoOffice(s): Legacy Management
Routine Monitoring and Maintenance, Sherwood, Washington, Disposal SiteCX(s) Applied: B1.3, B1.11, B3.1Date: 08/29/2011Location(s): Sherwood, WashingtonOffice(s): Legacy Management
Routine Monitoring and Maintenance, Slick Rock, Colorado, Disposal/Processing SiteCX(s) Applied: B1.3, B1.11, B3.8Date: 08/29/2011Location(s): Slick Rock, ColoradoOffice(s): Legacy Management
241-T Tank Farm Debris Barrier FenceCX(s) Applied: B1.11Date: 08/22/2011Location(s): Richland, WashingtonOffice(s): River Protection-Richland Operations Office, Golden Field Office
Protected Area Fence at 716-N (Portable Equipment Commodity Management Center Fence)CX(s) Applied: B1.11Date: 06/29/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office