Pre-construction due diligence, permitting, and acquisitions in support of construction of a new 138kV transmission line and rebuild existing 138kV…
The objective of this project is to enhance grid reliability, power quality, grid resilience, and increase efficiency through advanced technologies…
WAPA is proposing a one-time relocation of the Casa Grande substation perimeter fence located on the west side of the facility and the removal of t…
LM is responsible for long-term surveillance and maintenance of the Tuba City, Arizona, Disposal Site. LM is proposing the Secondary Source Term an…
LM is proposing to remove the existing fence and install a new fence at the Monument Valley, Arizona, Processing Site located on Navajo Nation land…
The Salt River Project (SRP) is proposing to build a new double circuit 69-kilovolt (kV) transmission line near Ray Road in Section 30, Township 1 …
The Salt River Project (SRP) is proposing to build a new double circuit 69-kilovolt (kV) transmission line near Ray Road in Section 30, Township 1 …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Long House Valley…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the San Carlos Apache Tribe (SCA) to design, develop, and install an integrated microgrid energy system, which would include a 500 kilowatt (kW) battery energy storage system (BESS), a 750 kW solar photovoltaic (PV) array, and a microgrid controller.
Replace (6) critical 230 kV wood structures with engineered foundational steel structures.…