Categorical Exclusion Determinations issued by Argonne Site Office.
DOCUMENTS AVAILABLE FOR DOWNLOAD
Argonne plans to remove trees in an area and situation that has a history of tree failure north of Substation 544.…
Replacement of storm sewer piping and culvert east and south of the parking lot would include selective demolition of existing area and grading alo…
This ERF covers activities associated with the installation and operation of the third Atmospheric Radiation Measurement (ARM) user facility, third…
This ERF covers activities associated with the installation and operation of the third Atmospheric Radiation Measurement (ARM) user facility, third…
New field sites have been added. The objectives of this project are to investigate, design and scale-up the assessment of the benefits of bioenergy…
Argonne will measure the resuspension of surrogate contaminated fallout particles (non-radioactive, non-hazardous) from the ground into the air.…
This ERF covers activities associated with the installation and operation of the third ARM Mobile Facility (AMF3), which is operated under the U.S.…
This scope of work (SOW) focuses on the installation of fiber optic cabling and supporting infrastructure through the Argonne outside cable plant c…
Decommissioning and Demolition of 100 Area coal yard Buildings 115 and 116 including equipment and structures conveyance of materials.…
Decommission and removal of IPNS pre-accelerators and 50MeV LINAC. Includes removal of vacuum and cooling systems. Isolation and termination of bui…