Upgrade the city's main backbone looped junctions, terminations, cable/conduit, and switches, replace the 35 kV submarine cable, connect generators…
Overhaul an existing generator unit by replacing the engine with a new engine of the same capacity. Perform engine testing prior to installation to…
Overhaul an existing generator unit by replacing the engine with a new engine of the same capacity. Perform engine testing prior to installation to…
Project management, site characterization, planning, modeling, and analysis. Planning and permitting for 2D seismic survey and geological (outcrop)…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to Alaska Village Electric Cooperative, Inc. (AVEC…
DOE's Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to Northwest Arctic Borough (NWAB) in support of their project t…
1.Reconfigure 41 miles of power line insulators 2. Reconductor 23 miles of transmission line 3. Relocate 2.1 miles of overhead conductors…
Remove and trim vegetative material growing under and around power transmission lines throughout the community, primarily along rights of way and t…
DOE's Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to Tanana Chiefs Conference (TCC) in support of their project to…
DOE's Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to Kokhanok's Village in support of the Kokhanok's Paradigm Shif…