Categorical Exclusion Determinations: Alabama

Birmingham Recreation Center Ground Source Heat Pump InstallationCX(s) Applied: A9, B5.1Date: 04/01/2010Location(s): Birmingham, AlabamaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Energy Retrofit for State Correctional Facilities - Ozone Laundry SystemsCX(s) Applied: B5.1Date: 03/24/2010Location(s): AlabamaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Kilby Correctional Facility Boiler ReplacementCX(s) Applied: B5.1Date: 03/24/2010Location(s): Mount Meigs, AlabamaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Decatur Work Release 10 Kilowatt Photovoltaic ArrayCX(s) Applied: B5.1Date: 03/24/2010Location(s): Decatur, AlabamaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Energy Retrofits for State Correctional Facilities - Bullock Correctional FacilityCX(s) Applied: B1.15, B5.1Date: 03/17/2010Location(s): Bullock County, AlabamaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Upgrades to Alabama Power Hydroelectric DevelopmentsCX(s) Applied: B5.1Date: 03/04/2010Location(s): Coosa River, AlabamaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Site Characterization for Carbon Dioxide Storage from Coal-fired Power Facilities in the Black Warrior Basin of Alabama (Drill)CX(s) Applied: A9, B3.1, B3.6Date: 02/10/2010Location(s): Walker County, AlabamaOffice(s): Fossil Energy, National Energy Tec...
Energy Efficiency and Conservation Block GrantCX(s) Applied: A9, A11, B5.1Date: 02/01/2010Location(s): AlabamaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Site Characterization for Carbon Dioxide Storage from Coal-fired Power Facilities in the Black Warrior Basin of AlabamaCX(s) Applied: A9, B3.1Date: 01/22/2010Location(s): Tuscaloosa, AlabamaOffice(s): Fossil Energy, National Energy Technology Laboratory