Upgrade /Replace the primary electrical distribution infrastructure for the south quarter of the NETL-Albany, Oregon site to increase capacity, rel…
Install a new code and ADA compliant sidewalk on the North Side of Building 1. …
Demonstrate the application of the use of an advanced multigamma attenuation (MGA) sensor to accurately and precisely measure coal properties at th…
Award Number: DE-EE0008779, CX(s) Applied: A9, Water Power Technologies Office, Location(s): UT, Office(s): Golden Field Office
Award Number: DE-EE0008136, CX(s) Applied: A9, B3.6, B5.16, Solar Energy Technologies Office, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0008732, CX(s) Applied: A9, B5.15, Wind Energy Technologies Office, Location(s): WA, Office(s): Golden Field Office
Award Number: DE-EE0008776, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): CA, Office(s): Golden Field Office
Award Number: DE-EE0008775, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): UT, Office(s): Golden Field Office
Award Number: DE-EE0008769, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): NJ, Office(s): Golden Field Office
Completion of FEED study, NEPA, and permitting for 10 MWe CO2 absorption pilot at CWLP host site, TEA update, and updating costs and schedules for …