Laboratory studies and experiments that will support the design of a first-of-a-kind (FOAK) CO2 mineralization technology for field testing at the …
Award Number: DE-EE0007917, CX Applied: A9, A11, Weatherization and Intergovernmental Programs Office, Location: IL, Office: Golden Field Office
Award Number: DE-EE0008097, CX(s) Applied: A9, B5.25, Water Power Technologies Office, Location(s): CA, Office(s): Golden Field Office
Phase II activities will include completing the NEPA and permitting process, revising the Front-End Engineering Design (FEED) if required, revising…
The overall objective of the project is to significantly improve the reliability and efficiency of existing coal-fired power plants under flexible …
Award Number: DE-EE0007347, CXs Applied: A9, B3.6, Water Power Technologies Office, Location: VA, Office: Golden Field Office
This project aims at developing and validating low-cost spinel-based materials synthesized with a multi-component alloy precursor for solid oxide f…
Project activities include the design, development, and field testing of environmentally safe contrast agents and geophysical methods to assess the…
The objective of Phase II is to build on the pre-FEED work completed in Phase I and be prepared to begin a detailed engineering design and construc…
USGS will measure surface water methane and CO2 concentrations and other parameters required to calculate the sea-air exchange of these greenhouse …