Support DOE GMD and EMP goals in the area of GMD protection. Purchase and install a GIC neutral blocking device at Weakley substation in the 500 kV…
Award Number: DE-EE0009110, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): VA, Office(s): Golden Field Office
Project management. Design, modification, and integration of combustor. Direct contact cooler, and boiler. Demonstration of integrated staged combu…
Modeling, design, optimization, and pilot scale testing of a coal fired supercritical CO2 primary heater.…
Develop and fabricate a full ceramic multiple tube bundle with a permeate purge capability and fabricate them into a modular unit for commercial in…
Co-optimization of Vehicle and Routes, CoVaR, to Improve Commercial Transportation System Efficiency…
Demonstrating Electric Shuttles for the New Orleans Region…
St. Louis Vehicle Electrification Rides for Seniors-SiLVERS…
Waste Not, Want Hot-A More Sustainable Way to Keep Buses Warm…
Develop and demonstrate high-volume applications for Coal Combustion Residuals, CCR, with annual usage on the order of billions of pounds.…