Complete Design Development, the Environmental Information Volume (EIV), the investment case, and a FEED study to redevelop the existing Recipient'…
Funding will support the project team's information gathering and analysis efforts to develop a framework and testbed for evaluating the potential …
Demonstrate the techno-economical feasibility of a 250 ton per day manufacturing facility to convert coal to high quality graphene.…
Accelerating AFV Adoption in Mid-America…
Objective is to integrate the liquid salt combined-cycle (LSCC) design in a combined cycle environment, interfaced with existing natural-gas combin…
Award Number: DE-EE0007349, CX(s) Applied: A9, B5.25, Water Power Technologies Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0009274, CX(s) Applied: A9, B3.6, B5.15, Bioenergy Technologies Office, Location(s): AZ, Office(s): Golden Field Office
Award Number: DE-EE0009288, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): CA, Office(s): Golden Field Office
Award Number: DE-EE0008733, CX(s) Applied: A9, B3.6, B5.15, Wind Energy Technologies Office, Location(s): OR, Office(s): Golden Field Office
Award Number: DE-EE0009268, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): MD, Office(s): Golden Field Office