INITIATE A TEN YEAR UTILITY SERVICE CONTRACT FOR NETL PITTSBURGH CX(s) Applied: A1 Date: 10/01/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Idaho Petroleum Reduction Leadership Project CX(s) Applied: A1 Date: 09/30/2013 Location(s): Idaho Offices(s): National Energy Technology Laboratory
I-75 Green Corridor Project CX(s) Applied: A1, B5.2, B5.22 Date: 09/26/2013 Location(s): Florida Offices(s): National Energy Technology Laboratory
Fate of Methane Emitted from Dissociating Marine Hydrates: Modeling, Laboratory, and Field Constraints CX(s) Applied: A1, A9, B3.6 Date: 09/25/2013 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory
Fate of Methane Emitted from Dissociating Marine Hydrates: Modeling, Laboratory, and Field Constraints CX(s) Applied: A1, A9, B3.6 Date: 09/25/2013 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory
Borehole Tool for the Comprehensive Characterization of Hydrate-Bearing Sediments CX(s) Applied: A1, A9, B3.6, Other: Bench Scale Laboratory Research Date: 09/25/2013 Location(s): Georgia Offices(s): National Energy Technology Laboratory
Fate of Methane Emitted from Dissociating Marine Hydrates: Modeling, Laboratory, and Field Constraints CX(s) Applied: A1, A9, B3.6 Date: 09/23/2013 Location(s): New Hampshire Offices(s): National Energy Technology Laboratory
Robust and Energy Efficient Dual-Stage Membrane-Based Process for Enhanced Carbon Dioxide (CO2) Recovery CX(s) Applied: A1, A9 Date: 09/17/2013 Location(s): California Offices(s): National Energy Technology Laboratory
Robust and Energy Efficient Dual-Stage Membrane-Based Process for Enhanced Carbon Dioxide (CO2) Recovery CX(s) Applied: A1, A9, B3.6 Date: 09/17/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Midwest Region Alternative Fuels Project CX(s) Applied: A1 Date: 09/17/2013 Location(s): Kansas, Kansas Offices(s): National Energy Technology Laboratory