Carbon Dioxide Capture By Cold Membrane Operation with Actual Coal-Fired Power Plant Flue Gas CX(s) Applied: A1, A9, B3.6, B5.5 Date: 01/28/2014 Location(s): CX: none, Delaware, Alabama, Pennsylvania, California Offices(s): National Energy Technology ...
Office of NEPA Policy and Compliance
January 28, 2014CX(s) Applied: A1, A9, B3.6, B5.5
Date: 01/28/2014
Location(s): CX: none, Delaware, Alabama, Pennsylvania, California
Offices(s): National Energy Technology Laboratory
Air Liquide will build a 0.3 MWe carbon dioxide membrane capture system, test the unit at the National Carbon Capture Center (NCCC), and perform laboratory testing on 0.1 MWe lab unit and engineering analysis.