703-23B Repaint Centerra dog kennels.…
Oil needs to be sampled to determine waste disposition.…
Construction is to rebuild the South Steam Station (SSS) lean-to like for like, reusing the existing doors and siding while replacing the tin, meta…
Perform renovations in Building 735-A, Rooms A-125 (office), A-143 (lab), and Lab 151.…
This EEC covers all maintenance activities performed by SRNS organizations that have the potential to disturb gasket and gasket-like materials (i.e…
The subcontractor shall provide all equipment, material, labor, and supervision for repairing culvert over NPDES Outfall H-07.…
Remove two coil winding machines in 722-4A Breaker Shop and replace with one upgraded coil winding machine.…
The portable air compressor will supply instrument air to support critical HAOM auxiliary process functions.…
Vendor will clean Weapons Cleaning Facility 617-10G.…
Trial run using ChemTreat CL4132 in 285-11H to reduce metal corrosion in H-Canyon cooling systems and subsequently reduce copper levels in H-12 Out…