Gas phase UF6, CO2 and water samples will be condensed on a diamond slide and studied using the Helios femtosecond transient absorption spectromete…
CX-025330: Removal of Trailer 706-7H, Replacement Trailer Installation (706-8H) in H-Tank Farm (HTF)
This EEC serves to cover the removal of trailer 706-7H within HTF.…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
Bonneville Power Administration (BPA) proposes to fund the Kittitas County Conservation District (KCCD), a member of the Yakima Tributary Access an…
Bonneville Power Administration (BPA) proposes to install a new series capacitor bank and associated switching and protective equipment at BPA’s Wa…
Bonneville Power Administration (BPA) proposes to allow ATT to upgrade existing long-term evolution (LTE) antenna equipment on existing transmissio…
This EEC covers the evaluation and corrections of HVAC compressors units in 773-A.…
Mini-Thermal Cycling Absorption Process (TCAP) components are to be designed and installed into secondary confinement in TEF, and tied in to TEF Di…
This activity is for preventative maintenance (PM) of air handling units in room 212 of 735-B.…