Development of a High-Rate Li-Air Battery Using a Gaseous CO2 Reactant …
Visual-Enhanced Cooperative Traffic Operations (VECTOR) System…
BE-SATED: Building Energy Storage At The Edges of Demand…
BPA proposes to allow T-Mobile to upgrade their antennas at the Maloney Ridge Radio Station.…
BPA proposes to fund the Confederated Tribes of Warm Springs Reservation of Oregon’s ongoing research and monitoring of Chinook (Oncorhynchus tshaw…
BPA proposes to allow Sprint, T-Mobile and Verizon to upgrade their antennas and equipment at existing wireless sites on BPA transmission towers an…
Phase 2 of this project will remove five test stations and the associated utilities.
Agent-Based, Bottom-Up Medium- and Heavy-duty Electric Vehicle Economics, Operation, Charging and Adoption…
AI-Based Mobility Monitoring System and Analytics Demonstration Pilot…
The Kesselring Site Building 81 Heating, Ventilation and Air Conditioning (HVAC) project consists of replacing the Test, Recording and Monitoring Room, Computer Room, Air Conditioner units, Air Handling Unit (AHU) and Condensing...