The jockey pump controllers associated with the fire pumps will be replaced to maintain proper system function.…
Subcontractor will provide roof replacement at 151-1C.…
Recovering refrigerant from non-radiological appliances in L-Area that contain less than 5lbs refrigerant at full charge.…
Partial D and R of water wall (shielding) in DBCF and install redesign (TBD) for more efficient access.…
R and D and maintenance of radiation detection systems.…
Environmental Sciences and Biotechnology Group will evaluate the impact of a group of microorganisms on the physical properties of tar sands contai…
Environmental Sciences and Biotechnology Group will evaluate the impact of a group of microorganisms on the bioremediation of petroleum contaminate…
Work instructions are to safely install, setup, and anchor the new Bridgeport Milling Machine and accessories in 717-F.…
Occasionally, the vacuum lines in the 735-B hood systems need to be repaired with new lines due to normal wear and tear.…
The US Department of Energy (DOE) proposes to demolish and remove Buildings 56 and 64 from the Lawrence Berkeley National Laboratory (LBNL or Berke…