Elevated Engagement, LLC will conduct routine administrative, technical assistance, and workshop related activities including facilitating peer lea…
General operation and maintenance of the Laser Flash Apparatus in the Hydrogen Technology Research Laboratory.…
The Nevada National Security Site (NNSS) Management and Operating (M and O) Contractor's Los Alamos Operations (LAO) occupy a single, three-story b…
This EEC covers various routine maintenance activities that occur in and around the buildings within the SRPPF Complex Area.…
Cut valve internals out and replace, welding and grinding is required.…
Airborne dust enters Building 218-1H through the five wall air intake louvers, which are not equipped with filters.…
Remove existing carpet tiles, floor tiles and mastic beneath carpet in room 216 and 36 in 234-H. Place new mastic and carpet in both rooms.…
Install an electric vehicle charging station (EVCS) at the Fernald Preserve Visitor Center (VC).…
Construction Craft to paint office areas in 248-H. Prior to painting, they will repair damaged wall surfaces by filling and sanding them smooth. Vi…
Assess and replace 234-H roof drain piping as applicable.…