Bonneville proposes to enter into an amended and restated firm power sales agreement with Port Townsend Paper Corporation, an existing direct-servi…
In this Final Rule, DOE is codifying in the Code of Federal Regulations the 45 lumens per watt (“lm/W”) backstop requirement for general service la…
Isolate electrical power, generator power and utilities (steam, water, air) to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F.…
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs.…
Install flow meter, solar panel with grounding rod, sampler, and sensor in stream at FM-H1.…
Subcontractor to perform roof repairs on building 730-A.…
Install Public Address (PA) system speakers at 717-10N and 717-3N, 714-2N, 704-1N, 704-3N, 713-N, 645-1N, 645-2N, 710-14N.…
Old technology is being replaced with new at outfall FM-1C.…
Refurbishing and repairing roof, windows, floors, and interior walls for 704-29E and 704-30E.…
Subcontractor will provide a roof replacement at 705-H.…