Remove out-of-service steam line section North of 722-4A and 723-A.…
Install solar panel and grounding rod and upgrade monitoring equipment at A-01 Outfall sampling house.…
It has been requested that a raised concrete pad be installed in the Transport Staging Area at MFC.…
The current battery bank in 251-F Substation will be removed and replaced with new batteries of the same type.…
Replace all windows at building 719-H per SOW.…
The Arcam A2X additive manufacturing machine produces complex metal parts from 3D computer aided design (CAD) models via electron beam melting.…
The Zeiss Sigma VP scanning electron microscope (SEM) is used to examine solids for imaging and elemental analysis.…
Install a Larger Air Receiving Tank (about 5000 gallons) for the CPC Purge Air Compressors at 422-S.…
Subcontractor will perform a core sampling of roofs Buildings 232-H, 264-H, and 264-2H with SRS asbestos group.…