Current Transmitters to be installed for Saltstone Mixer Alternating Current (A/C) current monitoring.…
The jockey pump controllers associated with the fire pumps will be replaced to maintain proper system function.…
Subcontractor will provide roof replacement at 151-1C.…
Recovering refrigerant from non-radiological appliances in L-Area that contain less than 5lbs refrigerant at full charge.…
Partial D and R of water wall (shielding) in DBCF and install redesign (TBD) for more efficient access.…
R and D and maintenance of radiation detection systems.…
Environmental Sciences and Biotechnology Group will evaluate the impact of a group of microorganisms on the physical properties of tar sands contai…
Environmental Sciences and Biotechnology Group will evaluate the impact of a group of microorganisms on the bioremediation of petroleum contaminate…
Work instructions are to safely install, setup, and anchor the new Bridgeport Milling Machine and accessories in 717-F.…
Occasionally, the vacuum lines in the 735-B hood systems need to be repaired with new lines due to normal wear and tear.…