The Building 233-H Special Container Loading/Unloading (SCLU) Stripper Valve Replacement outage consists of the following activities: 1. Replace th…
Isolation and removal of OKUMA LU15 CNC Twin-turret lathe (DOE 008067) from Building 226-2F to SRSCRO.…
The Hot and Cold Nitrogen (HCN) System Pressure Relief Valves (PRVs) are replaced every 48 months per Preventive Maintenance (PM) Work Orders.…
Bonneville Power Administration (BPA) proposes to fund the Idaho Department of Fish and Game (IDFG) to survey species populations and remove rainbo…
The scope of the Warehouse Upgrade Project includes demolition of the concrete floor slab to install plumbing piping and minor interior demolition.
Establish Digital Density meter analytical capability in 735-A, D-wing.…
Analysis of water samples using liquid scintillation spectrometry.…
This ongoing activity is to provide high sensitivity analyses of samples from on and off site locations.…
This activity will evaluate the chemistry and engineering aspects of a process for stripping chloride from nitric acid solutions using heat, gas sp…
Replace fuel oil heater No. 45 in building 717-3N and abandon in place existing unit No. 47.…