Additional FEDNET Communications Data Drops will be installed in 105-K.…
Upgrade fire detection and alarm system in Building 704-K.…
Remove the south rail stop from the 105-L transfer bay area.…
Seal the near side handball court, 191-L access plugs and entry hatch cover to prevent water intrusion into the building.…
Remove and replace insulation on steam lines in L-Area.…
A new wireless remote Start/Stop will be installed at M-Area Recovery Wells (RWMs) 2, 3, 4, 5, 6, 7, 8, 10, and 18.…
Three soil borings will be strategically advanced to a depth of 240 feet at the M-Area Hazardous Waste Management Facility: Western Sector In-Situ…
Emulsified zero valent iron (EZVI) will be injected into the subsurface using six fracture/injection points northwest of the M-Area Settling Basin.…
The Saltstone Dust Collectors are to be equipped with pressure relief protection.…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Public Commission of Wisconsin to fund the installation of a backup 50kW…