Construction to excavate soil on west and north sides of 735-A, A-Wing Basement in order to repair existing underground commodity penetrations in t…
This project seeks to develop a high performance catalyst with significantly improved activity.…
Modify TRU PAD 4 for additional equipment. System will need electrical power and design support.…
Remove and replace fire dampers FD-292-104 and FD-292-115 and their associated penetration seals in Building 292-S.…
Modify the 511-S Steam System to an Out of Commission Configuration.…
Repair 2 leaking roof drain pipes in 722-A.…
784-7A Ceiling insulation repair.…
703-10B Soffit and gable repair, prep, and paint (Dog kennels).…
The storage tank room plugs will be cleaned and resealed.…
There are three [3] locations in the 717-1N Boilermaker Shop where the base plate and lower section of the structural steel column supports have de…