TCAP Column A, along with TCAP Feed Beds A and B and TCAP Product Bed B and TCAP Deuterium Beds A and B are to be replaced in-kind by new component…
The existing gravel road around the E-Area Trailer Complex will be paved.…
717-F Annex renovations.…
The obsolete recloser on H3B feeder is reaching the end of its life cycle and should be replaced.…
Install new equipment (HVAC unit and Ice maker) at 725-1N.…
Small radioactive particles will be deposited on planchets using aerosolization.…
The activity consists of making magnetic susceptibility measurements of different samples inside of their containers.…
This EEC covers all low hazard, routine, and repetitive task work activities that can be performed in the Savannah River Mission Completion (SRMC) …
Subcontractor will provide roof replacement on Buildings 713-2N, 713-3N, and 731-2N.…
Conduct repairs to gypsum board credited firewalls in 735-B.…