This task involves cleaning and packaging of stainless steel tubing and similar components.…
714-5N, Facility Renovation, which includes civil and electrical repairs and renovations.…
Uranium is analyzed using kinetic phosphorescence in the UV range in 773-A, B-103.…
Extend the H Tank Farm Tank 29 purge exhaust stack to 50 feet above the tank top.…
Temporary rectifier is to be replaced with a permanent smaller rectifier for the S-Area Diesel Fuel Oil Underground Storage Tank and Underground Pi…
Remove current fire alarm equipment and install new equipment in its place.…
780-2A Chemical tank removal and grout chemical dike.…
736-A Room 104,107, and 108 Remodel.…
Battelle Energy Alliance (BEA) is performing the “INL PVHA Project” to conduct a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 study on …
Replace soda ash piping and pumps at 607-59G.…