A pH electrode will be used to determine the pH of solutions. Chloride and Fluoride concentrations will be determined via ion specific electrodes.…
The objective of this study is to better understand the mechanisms of strontium sorption in aquifer sediments.…
Clearing of forested area near 703-B running track.…
The U.S. Department of Energy (DOE) is proposing to provide funding to Flowserve for the development of blended materials (blends) consisting of hi…
Bonneville Power Administration (BPA) proposes to allow Henkels and McCoy, the applicant, to install about 610 feet of new underground fiber optic cable and buried cable marking tape in the rights-of-way for three BPA transmission lines: Ross - Vancouver Shipyard No. 1, North Bonneville - Ross No. 1, and North Bonneville - Ross No. 2.
Engineering Standard 15888 requires the change of HEPA/pre-filters. Maintenance will perform the seven year PM to change HEPA and prefilters.…
There is a sodium nitrite "jelly-like" blockage in the heel of the Sodium Nitrite Feed Tank located on the third level of 221-S. The blockage is pr…
709-1G Install power drop.…
The proposed activity prepares building 782-1M for deactivation by removing all electrical energy from the structure.…
Caustic dissolution of alum-inum metal is to be studied to support fuel target processing.…