Administrative and project management activities, computer modeling and analysis
This is to add a subcontractor to an existing project to test their strain sensor.…
Funding will support the project team's small-scale research and development of efficient cell-free enzyme cascade reactions to produce isobutanol-…
Funding will support the project team's small-scale research and development of hollow fiber membranes to selectively strip CO2 from ocean water.…
The project will no longer be installing a septic system and will instead install a sewer line connecting to the existing sewage lagoons located no…
The Defense Waste Processing Facility (DWPF) is switching from Formic Acid to Glycolic Acid within the process. As such, Formic Acid is no longer r…
The motor circuit for (Canyon ID) pump FA2 has a solid ground fault. There remain no original radiation grade (hardened) 15 Hp motors in the in the…
This EEC covers analytical methods for Radiochemical Measurements.…
RIT-1029 is being removed from service since it is no longer needed.…
The purpose for this Scope of Work (SOW) is to replace the pea gravel sidewalk located at the premises of 704-7B and 704-12B and to extend the side…