C. E. Bourne Subcontractor 00000611 will perform roof repairs on 703-41A. The Subcontractor will not disturb the existing roof on 703-41A.…
This EEC covers the preliminary surveys, real estate lease, siting, construction, utility installation, and operation of the AT and T Pen Branch Ce…
Install 2 CNC Machines for Advanced Engineering Group, Bldg 723-A, Room 161, (1) Install HAAS ST-20 CNC lathe and provide power and compressed air …
C. E. Bourne Subcontractor 00000611 will provide roof repairs at 735-17A. The Subcontractor "will not" disturb the existing roof while performing t…
Lab-scale flow experiments using test bed; Fluids: CO2, N2 and H2O…
Fundamental research on cybersecurity of electric power systems. R and D in Phase I (two years) and Demonstration in Phase II (1 year).…
During this project the recipient will construct and demonstrate patented and pre-commercial waste-to-energy and concentrated solar power technolog…
Fundamental research on cybersecurity of electric power systems. R and D in Phase I (two years) and Demonstration in Phase II (1 year).…
The U.S. Department of Energy (DOE) is proposing to administer congressionally directed spending to the University of Texas at Dallas (UTD) to modi…
The U.S. Department of Energy (DOE) is proposing to provide funding to University of Illinois Chicago (UIC) to implement inverter-based resource (I…