The work consists of scraping the peeling paint on the ceiling of various offices and repainting them, removal of the existing carpeting throughout…
The subcontractor, Queen City Railroad Construction, shall replace wooden line ties from the railroad bed, identified by site transportation and en…
This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…
The Chemical Process Cell (CPC) Purge Air Receiver is too small for the flowrate needed by the CPC vessels.…
The failed roofing system on the 704-L roof will be demolished and replaced. This will prevent numerous leaks that currently plague the building.…
Filters will be replaced, units will be DOP tested and ventilation tested.…
Replace a door at building 701-3G (Barnwell Barricade).…
The current battery bank substation in 251-H will be removed and replaced with new batteries of the same type.…
The sole amendment to the prior NEPA Determinations is a change in one location of work, moving from Jet Propulsion Laboratory in Pasadena, Califor…
This Third Amended Determination adds 5 projects (Columbia University, University of Kentucky, Pacific Northwest National Laboratory, Travertine Te…