Develop an advanced CO2 mineralization technology for coproduction of value-added carbonate and fertilizer products.…
Real-time operational training data from bituminous coal-fired boiler at the Pacificorp Plant will be fed into the Miniaturized High-Temperature Mu…
Monitor deformation continuously during Utah FORGE operations using both surface and downhole strainmeters, tiltmeters, and seismometers…
713-4N Replace door at Pipe Yard office.…
704-3N Correct walkway.…
Fabricate and replace the existing guardrails on the dock at 713-2N.…
766-H Install PA speakers.…
Remove/Replace the 3 Magnetrol level switches at 285-H Basin.…
Remodel of the kitchen area of building 709-1 G.…
Add crush and run to construct an access road to Gate 34 to help facilitate access to emergency vehicles during emergency response or drills.…