This EEC covers exterior painting in N area.…
Reinsulate pipe on water heater in 704-4N…
Vacuuming "Cobweb" Growth from L-Area Vertical Tube Storage Racks…
Touch up paint on 704-39G (storm shelter) and repair sheetrock/touch up paint in in 704-22G (conference room)…
Repair roof drain leak in elbow above conference room ceiling. Elbow and leak location (determined by Subcontractor) is covered by insulation with …
A number of lysimeters are to be installed around Saltstone Disposal Unit (SDU) 6 for detection of radioactive and chemical contamination in surrou…
Updated Project Title to include Mobile Hot Cell (MHC).…
Project team will conduct a Front-End Engineering and Design study of a pipeline system routing from gulf coast of LA to the central gulf coast of …
Installing relays and batteries at Crow Hill Substation Power Control Room on Mohegan Trust Land Installing relays and batteries at Fort Hill Subst…