The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to Medford Irrigation District (MID) to install a …
DOE proposes to adopt test procedures for consumer products, and commercial and industrial equipment that manufacturers of covered equipment must u…
The U.S. Department of Energy (DOE) administers the Weatherization Assistance Program (WAP) as authorized by Title IV, Energy Conservation and Prod…
The U.S. Department of Energy (DOE) administers the Weatherization Assistance Program (WAP) as authorized by Title IV, Energy Conservation and Prod…
A Japanese Cask will have a temporary modification made to allow it to be repositioned from the side.…
Per modification traveler MT-TRI-2024-00002, two additional unclassified DCS workstations are required to be installed in the Building 233-H Centra…
Remove water fountain and associated water filter from 247-H. Replace the water fountain with a bottle filling / water fountain combination.…
Replace the 50 ton chiller (T948-500-10) located inside of Building 249-H.…
Incoming 13.8kV and 125VDC power to 784-A switchgear is to be removed.…
Slug testing is to be completed at twenty (20) wells at the CMP Pits.…