Subcontractor will perform a roof repairs on 749-A. The Subcontractor will not disturb the existing roof on 749-A.…
Lab C-059 needs a new T-branch and piping to supply an argon connection point to a hood.…
K-Area CCO Storage Pad Wire Guidance Tracking System Modification.…
Replace all floor tiles at 702-1C per Acknowledgement of Scope.…
SRS has identified potential locations that could support a utility-scale solar power plant to achieve the goal of 100 percent Carbon Pollution Fre…
This project is specific to the implementation of a Record of Decision (ROD) for three FFA subunits that are located within the N Area boundary: Ea…
Deploy grid enhancing technologies (GETs), dynamic line ratings (DLR) and edge computing devices (ECD), in the Recipient’s electric service territo…
Feedstock reserve drilling and testing, lab-scale production to optimize CM recovery, engineering design of potential future plant with cost estima…
The U.S. Department of Energy (DOE) is proposing to provide funding to General Atomics (GA) to pursue a composite-based, new manufacturing method f…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Pacific Ocean Energy Trust (POET) to administer the Testing and Access f…