Replace glovebox oxygen alarm panel annunciator in Control Room of Building 264-H.…
CX-030718: Replacement of Scanning Electron Microscope (SEM) in Inert Metallography Laboratory (IML)
The JEOL JSM-6460LV Scanning Electron Microscope (SEM), along with all peripheral attachments, are to be removed and replaced with a new SEM.…
With the evolving construction of the Surplus Plutonium Disposition (SPD) Project an existing Quonset hut (763-111N) will be removed, and a new fab…
Tornado shelters shall be installed in various places around F-Area to support the SRPPF project.…
Project management, Development of pre-FEED study of intermodal transport hub, Permitting and regulatory plan, Techno-economic assessment, Hazard i…
Planning characterization activities to include: office-based work such as data analysis, modeling, outreach, and permitting, and lab experiments. …
Geophysical work is conducted via conductivity/resistivity surveys and magnetic surveys. …
Pilot testing of carbon capture solvent in existing demonstration-scale amine plant and laboratory analysis of solvent samples.…
Bonneville Power Administration (BPA) proposes to fund the Kittitas County Conservation District (KCCD) of the Yakima Tributary Access and Habitat …
The Bier lab investigates how microbial communities control the flow of energy and matter through ecosystems by combining microbial ecology and bio…