The ULTIMATE Phase 2 Program seeks to investigate selected alloy compositions and coatings to evaluate a comprehensive suite of physical, chemical,…
This Second Amended Determination follows the approval of additional funds to support the project team's small-scale research and development activ…
Replace existing electric distribution alley locations (3,900 feet of line, 36 poles, 28 transformers and three-phase conducter). Replace four exis…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Ecolectro, Inc. for design, synthesis, fabrication, characterization…
The subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to …
Removal of LANA material from PS Hydride Beds A and D.…
Bonneville Power Administration (BPA) is proposing to fund the McKenzie River Trust to purchase an approximately 245-acre parcel of land located ab…
This Amended Determination follows the approval of additional funds to support the project team's small-scale research and development activities t…
Bonneville Power Administration (BPA) proposes to remove, replace, upgrade, and/or modify outdated equipment at Chief Joseph Substation and to repl…
Subcontractor shall furnish all materials, equipment, tools, supplies, transportation, facilities, labor, supervision, and services required to ins…