Replace the 50 ton chiller (T948-500-10) located inside of Building 249-H.…
Incoming 13.8kV and 125VDC power to 784-A switchgear is to be removed.…
Slug testing is to be completed at twenty (20) wells at the CMP Pits.…
The project seeks to expand critical grid management capabilities by boosting network capacity, enhancing control of loads from inverter-based reso…
The project will pursue a feasibility study and characterization of geologic suitability for the development of a carbon dioxide (CO2) storage Hub …
Prep and Re-paint the FP Dry Pipe System for the 773-2A Cylinder Shed and Supply line from valve house.…
This EEC covers various renovation activities for Building 703-41A.…
Repairs in building 737-G…
This EEC covers spray-painting activities supporting SRS projects. (See temporary relocation note)…
713-N Replace door/cipher lock.…