Categorical Exclusion (CX) Determinations By Date

Replacement of Twenty 22-L Structures on the Satsop-Aberdeen Number 2 230-kilovolt Transmission LineCX(s) Applied: B1.3Date: 08/12/2010Location(s): Gray's Harbor County, WashingtonOffice(s): Bonneville Power Administration
Davis Dam Switchyards (Erosion Control)CX(s) Applied: B1.3Date: 08/12/2010Location(s): Mohave County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region
Blue Ridge Community Unit School District #18CX(s) Applied: B5.1Date: 08/12/2010Location(s): Mansfield, IllinoisOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Geothermal Incentive Program - Thomaston Valley Village Building 2 GeothermalCX(s) Applied: A9, B2.2, B5.1Date: 08/12/2010Location(s): Thomaston, ConnecticutOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Geothermal Incentive Program - WallingfordCX(s) Applied: A9, A11, B2.2, B5.1Date: 08/12/2010Location(s): Wallingford, ConnecticutOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Geothermal Incentive Program -Leeway-PutnamCX(s) Applied: A9, A11, B2.2, B5.1Date: 08/12/2010Location(s): Putnam, ConnecticutOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Geothermal Incentive Program -GordonCX(s) Applied: A9, A11, B2.2, B5.1Date: 08/12/2010Location(s): Avon, ConnecticutOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Geothermal Incentive Program -McCudaCX(s) Applied: A9, A11, B2.2, B5.1Date: 08/12/2010Location(s): East Windsor, ConnecticutOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory